|
247
|
|
PEDESTAL - INSTALLATION INSTRUCTIONS Model 7400 - Pedestal boxes may be bolted to a concrete pad by 2 methods - lag bolts or wedge anchors.
|
|
1. Lag Bolts - Place mailbox module in position and mark hole locations on concrete pad. - Remove module - Drill 4 - 5/8" holes into concrete pad - Drill 2 - 1/2" down for 2 - 1/4" lead anchor shields - tap flush to surface of concrete - Re-position mailbox module so that holes in baseplate align with holes in pad - Use 3/8" lag bolts - 2" long with plate washers. Ratchet bolts securely - do not over turn bolts as they may snap. |
|
|
2. Wedge Anchors Wedge anchors may also be used and offer the advantage of placing the mailbox on location only once. - Place box in final position - Drill 3/8" pilot holes 3" deep -down through the holes in the pedestal baseplate - Insert wedge anchors into holes and tap down into hole using hammer - Ratchet wedge anchors securely to concrete pad. |
|
 |
Required Tools 1/2" hammer drill Ratchet or heavy duty pliers or open box wrench hammer
For Option 1 - Lag Bolts: 5/8" masonry drill bit 4 - 3/8" x 2" lag bolts 4 - 5/8" x 2 1/4" lead anchors
For Option 2 - Wedge Anchors: 3/8" masonry bit 4 -3/8" x 2-3/4" wedge anchors |
STANDARD PAD PREPARATION
|
 |
|
| |
|

|